| ||
Finished Projects Gallery | Cypress Creek LakesAnother successful project completed where Sprint Sand and Clay built a 2 acre detention pond/amenity lake. The project consisted of excavation and removal of 80,000 cubic yards of material. A clay liner was also installed along with the concreate hard edge and stabilized sand and safety slope you see in the attached. This was another successful project that turned out great as you can see in the video.
|